Mastic Asphalt Podium & Roof System
Standard Flat Roof SystemPodium Terrace Roof System

Union & Co

ArchitectLeuschke Group
ContractorFletchers Construction
Size1500m2
year2019

Scope

Conrad Properties were looking to waterproof another of thier numerous apartment project in Auckland

Solution

Asphaltech worked with Leuschka architects at the early design stage to specify and detail the podium and roofs of this large apartment complex. In working at design stage we were able to follow the project from concept to completion, changing the details easily as we go.

"George Griffiths personally supervises his small team, who all work to highly professional standards ensuring that the exacting detailing required by the Museum's heritage architects is always met or exceeded. "
JOHN GLEN, Auckland Museum Facilities Manager // AUCKLAND WAR MEMORIAL MUSEUM
"Mastic asphalt has a long life span of 60 years (source RICS). Fully recyclable, it has a low impact on the environment. Benefits of mastic asphalt are its durable, waterproof, voidless and self compacting."
Pure Asphalt Company Limited – UK