Pacoflex Mastic Asphalt podium roof deck
Podium Terrace Roof System

Rose Gardens

ArchitectContext
ContractorCMP
SystemPacoflex Podium System
Size1600m2

Scope

Rose Gardens was designed with a complicated split level podium with various landscape designs

Solution

Our premium podium solution was selected due to it's hard wearing robust nature that was suited to a staged construction process allowing various fascade elements to be finished in stages

"George Griffiths personally supervises his small team, who all work to highly professional standards ensuring that the exacting detailing required by the Museum's heritage architects is always met or exceeded. "
JOHN GLEN, Auckland Museum Facilities Manager // AUCKLAND WAR MEMORIAL MUSEUM
"Mastic asphalt has a long life span of 60 years (source RICS). Fully recyclable, it has a low impact on the environment. Benefits of mastic asphalt are its durable, waterproof, voidless and self compacting."
Pure Asphalt Company Limited – UK