Podium Terrace DeckInverted Ballasted Roof

France St Apartments

ArchitectPaul Brown
ContractorCMP Construction
Size2750m2
Year2019 on going
Products/systems usedPermaTEC podium 7 Ballasted Inverted Roof System

Scope

Paul Brown architect looked for an economical system that had minimal to zero falls to enable an extra floor level with in the height restriction

Solution

PermaTEC Roof terrace and Inverted Ballasted system choosen due to the minimal build up at the thresholds. 

"George Griffiths personally supervises his small team, who all work to highly professional standards ensuring that the exacting detailing required by the Museum's heritage architects is always met or exceeded. "
JOHN GLEN, Auckland Museum Facilities Manager // AUCKLAND WAR MEMORIAL MUSEUM
"Mastic asphalt has a long life span of 60 years (source RICS). Fully recyclable, it has a low impact on the environment. Benefits of mastic asphalt are its durable, waterproof, voidless and self compacting."
Pure Asphalt Company Limited – UK