Podium Terrace Roof System

B Hive

ArchitectJasmax
ContractorLeighs Construction
Size1800m2
Year2017

Scope

Pacoflex was once again choosen by Jasmax to waterproof the podium of the basement car park at this unuque outdoor food and beverage area, that is attached to the award winning B-Hive building on Smales Farm

Solution

Our low fall membrane solution was perfect for the project to ensure stability of the tiled surface which was applied on a jack system. As Mastic Asphalt has no lap joints, it is uniquely placed in the market as the best solution for this application.

"George Griffiths personally supervises his small team, who all work to highly professional standards ensuring that the exacting detailing required by the Museum's heritage architects is always met or exceeded. "
JOHN GLEN, Auckland Museum Facilities Manager // AUCKLAND WAR MEMORIAL MUSEUM
"Mastic asphalt has a long life span of 60 years (source RICS). Fully recyclable, it has a low impact on the environment. Benefits of mastic asphalt are its durable, waterproof, voidless and self compacting."
Pure Asphalt Company Limited – UK