Podium Terrace Roof System

Auckland University of Technology

ArchitectJazmax
ContractorFletcher Construction
Area800m2
Specification2 X 10mm of Mastic Asphalt Roofing

Scope

The clients brief was simple they wanted a product that was durable and would last the lifetime of the building.  Being as the podium was protecting some expensive equipment sound equipment below. There was only one choice to make Mastic asphalt.

Solution

Due to the monolithic nature, strength, durability and overall performance of mastic asphalt it was selected for this project. As the product is seamless there was less opportunity for ponding on the surface. A specification of 2x10mm of mastic asphalt roofing was selected to the complete surface except in the tree pits where there was a 3x10mm to the high vertical surfaces. The complete surface was then covered with a concrete wear slab and tree planting to the raised planter areas. Once again New Zealand’s largest mastic Asphalt Company had great success.

"George Griffiths personally supervises his small team, who all work to highly professional standards ensuring that the exacting detailing required by the Museum's heritage architects is always met or exceeded. "
JOHN GLEN, Auckland Museum Facilities Manager // AUCKLAND WAR MEMORIAL MUSEUM
"Mastic asphalt has a long life span of 60 years (source RICS). Fully recyclable, it has a low impact on the environment. Benefits of mastic asphalt are its durable, waterproof, voidless and self compacting."
Pure Asphalt Company Limited – UK